Cassowary Coast Regional Council wishes to advise that contractors RMS Engineering & Construction will be commencing/continuing the following works as part of the Mission Beach Town Centre Revitalisation:

Overall Works:

  • Continuation of stormwater infrastructure installation on Porter Promenade and Campbell Street
  • Continuation of David Street pavement & landscape works
  • Continuation of the toilet block
  • Start of construction of the awning footings in Village Green South side (Sky Dive Building)

Work times: 6am to 6pm Monday – Friday [Saturday work as required]

Works in July will include:

Traffic & Site Changes:

  • Traffic on Porter Promenade will continue along the eastern side of Porter Promenade, and remain as one lane
  • David Street diversion lane (only open to local traffic) will be maintained by the Contractor, with spotters and traffic control devices
  • Pedestrian access diversions around The Pirate Den Bar and Grill, Porter Promenade & Village Green, for footing construction works

Stormwater:

  • Stormwater works will progress from Porter Promenade moving north and south along the western side of Porter Promenade
  • Stormwater works continuation both sides of Campbell Street

Awning:

  • Awning footing works will continue in Village Green, from former Pirates Den to Mission Beach Adventures, including work setup and in-ground footings for awnings. Works will commence along the southern side of Village Green with excavations starting outside the Sky Dive building within Village Green.

Toilet Block:

  • Continuing construction of toilet block foundation works and walls, within the Village Green, with some changes to pedestrian access

Pavement Works:

  • Continuation of concrete pavement on David Street with associated changes to local traffic flow & pedestrian access during construction

Works Locations:

Please note that access and work areas may change regularly, and updates will be provided as required.

Please refer to the following map to see the work area and contingency plans:

Temporary impacts because of these works

  • Delivery vehicle bay will move as required to a new location on Porter Promenade
  • Alternate routes for traffic, parking, and pedestrian movement will be in place
  • Traffic lights will be in place
  • Some parking spaces will continue to be temporarily lost within the works location
  • Business access will be maintained by the Contractor
  • All residents and businesses affected by planned service disruptions will be notified two weeks in advance by the Contractor
  • Potential noise pollution due to machinery
  • Fencing will be installed around any open excavations, and pedestrian areas will be restored wherever required

Every effort will be made to reduce disruptions during this time, and we thank you for your patience and cooperation.

For further information:

All stakeholders wishing to receive works notification updates and news associated with the Mission Beach Town Centre Revitalisation Works are requested to ‘Follow’ the Project Page at yoursay.cassowarycoast.qld.gov.au/mission-beach-town-centre-revitalisation-project.

To speak with a construction engagement officer please call RMS Construction on 0484 508 101 or email the project team at missionbeach@ccrc.qld.gov.au